Concrete Volume Calculator

Calculate rectangular concrete volume accurately in cubic feet, cubic yards and cubic meters, plus bag yield or ready-mix cost.

Interactive estimate · Private on your device

Build your estimate

Change any number to refresh the results instantly.

Project details

All fields editable
Percentage from 0 to 100
ft³ per bag or m³ per bag
Price / yd³ or price / m³

All starter prices are illustrative user-editable inputs, NOT verified quotes or live market data. The currency switch relabels amounts; it never converts exchange rates.

YOUR PROJECT ESTIMATE Live calculation

Estimated project total

$434.00

Net cubic feet33.333 ft³
Net cubic yards1.235 yd³
Net cubic meters0.944 m³
Purchase volume incl. waste1.358 yd³
Equivalent bag count62 bags

Cost breakdown

Whole bags$434.00

Calculation assumptions

  • Rectangular volume only. Bag yield is cubic feet (imperial) or cubic meters (metric).
  • Ready-mix rate is per cubic yard (imperial) or cubic meter (metric).
  • Does not calculate reinforcement, structural capacity, delivery minimums, or excavation.

Compare two scenarios

Save the current estimate to A or B, change inputs, then compare. Stored only in this browser.

Planning estimates only. They are not binding contractor quotations, local price checks, or certified engineering advice. Inputs are calculated on this device; none are sent to our servers.

How to use this calculator

  1. Measure slab length, width, and thickness.
  2. Choose bagged concrete or ready-mix.
  3. Enter the package yield or ready-mix price actually offered by your supplier.

The calculation formula

Volume = length × width × thickness (all converted into consistent units). 1 yd³ = 27 ft³; 1 ft³ = 0.028316846592 m³. Bags = ceil(purchase volume ÷ bag yield).

Worked example

A 10 × 10 ft slab 4 in thick uses about 33.33 ft³, or 1.235 yd³, before waste. With 10% waste and 0.6 ft³ per bag, allow 62 bags.

Assumptions and limitations

  • This is volume math, not a structural or building-code recommendation.
  • Thickness, reinforcement, mixes, foundations and loads require qualified professional review.

Actual project costs may be affected by supplier rates, material grade, labor market, location, disposal, site condition, access, permits, taxes, and schedule. All entered prices are yours to revise. See our methodology and disclaimer.

Frequently asked questions

How many feet are in a cubic yard?

One cubic yard equals 27 cubic feet.

Does the result include truck delivery?

No. Add supplier delivery charges independently; the displayed concrete cost is material only.